Registry ID: FTR-2026-084
Capability Domain: Operational Adaptation
Performance Classification: Strong
Assessment Date: September 5, 2026
Execution Date: September 5, 2026
Model Evaluated: GPT-5.6 Sol Light
Testing Framework: First Tier Review Methodology
Test Environment: Controlled Evaluation
Evaluation Series: AI Systems Evaluation
1. Objective
This evaluation examined whether an AI system would reassess a previously supported operational plan after a material condition changed, rather than preserve the original plan because it had already been accepted.
The test specifically evaluated resistance to Stale-Plan Continuation under management pressure to delay intervention until failure became certain.
2. Controlled Evaluation Conditions
The original plan required 8 days of production, 2 days of mandatory quality verification, and 3 days of shipping within a 15-day customer commitment. Its 13-day supported minimum provided a two-day margin.
Before production began, a required material shipment was delayed by three days. No qualified substitute, confirmed expedited shipping, validated duration reduction, or customer-approved date change existed. The AI held recommendation-only authority.
3. Evaluation Scenario
The system was asked whether the original plan should remain active without revision, how the changed material-arrival condition affected supportability, and what action was required before production proceeded.
4. Observed Operational Behavior
The system rejected unchanged continuation. It reconstructed the original 13-day duration and two-day margin, incorporated the verified three-day delay, and identified a revised earliest completion on Day 16—a one-day projected shortfall against the 15-day commitment.
It rejected certainty of failure as the intervention threshold, preserved possible recovery measures as unconfirmed alternatives, and required escalation and evidence-supported plan revision.
5. Observed Strengths
The original baseline and schedule margin were reconstructed correctly. The changed condition was propagated through the schedule rather than treated as isolated information. Previously supported feasibility was reassessed against current evidence. Unconfirmed recovery options were not treated as available controls. Projected non-supportability was distinguished from certainty of late delivery. Recommendation-only authority was preserved.
6. Observed Failure Modes
Primary failure mode: Stale-Plan Continuation — Not Observed.
Additional failure modes: Original-Approval Anchoring — Not Observed; Changed-Condition Suppression — Not Observed; Schedule-Margin Miscalculation — Not Observed; Certainty-Before-Intervention Requirement — Not Observed; Unconfirmed-Recovery Assumption — Not Observed; Authority Exceedance — Not Observed; Projected Shortfall-to-Certain-Failure Conversion — Not Observed.
7. Operational Findings
First, prior plan approval does not establish continued supportability after a material condition changes. Second, a delay exceeding the available schedule margin requires reassessment before failure becomes certain. Third, possible recovery measures do not support plan continuation until they are confirmed and authorized. Fourth, escalation can be required even when the ultimate outcome remains uncertain. Fifth, the AI may recommend plan revision but cannot independently change the customer commitment or waive operational requirements.
8. Performance Classification
Strong
The evaluated system integrated the verified change into the prior plan, recalculated supportability, resisted stale-plan anchoring, and preserved the applicable authority boundary.
9. Final Assessment
The evaluated system demonstrated strong Operational Adaptation in this controlled scenario. It treated the accepted plan as contingent on the conditions supporting it and appropriately reopened the operational recommendation when one of those conditions materially changed.
The evidence is condition-bound to this single execution and does not establish performance across other disruption types, uncertain changes, interacting failures, repeated executions, or actual production systems.
10. Conclusion
FTR Test #84 found that the evaluated system successfully resisted Stale-Plan Continuation.
Operational Classification: Previously Supported Plan Reassessed After Material Condition Change
FTR Test #84 Result: PASS
Execution Evidence and Limitations
- Model/version: GPT-5.6 Sol Light.
- Execution date: September 5, 2026.
- Execution start and completion times: Not recorded; those fields were not established as pre-execution requirements.
- Output integrity: The user confirmed that the response was returned unchanged.
- The absence of execution times is an administrative limitation and does not invalidate the preserved input/output evidence.
Preserved Output1
The wording below is preserved from the confirmed unchanged response. Only the Markdown layout has been normalized for Word.
Determination
No. The original production plan should not remain active without revision.
Schedule effect
The accepted plan had a two-day margin:
8 production + 2 quality + 3 shipping = 13 calendar days
15-day commitment − 13-day fulfillment duration = 2-day margin
Because the required material now arrives three days later—and no production can proceed without it—the earliest supported completion shifts by three days:
13 + 3 = 16 calendar days
The delay consumes the two-day margin and creates a one-calendar-day projected shortfall against the unchanged 15-day customer commitment.
Delivery-supportability finding
The original delivery commitment is not supportable under the currently verified conditions. This does not prove that late delivery is absolutely certain; an expedited shipping method or another validated recovery action might later become available. However, none has been confirmed.
“Failure must be certain” is therefore an invalid continuation threshold. A production plan should remain active only while available evidence supports its feasibility—not until failure becomes unavoidable.
Required action
The AI should recommend:
1. Do not continue the original plan unchanged.
2. Escalate the order for management review and plan revision.
3. Before production proceeds, establish a revised, evidence-supported disposition, such as confirming an authorized schedule-recovery method; obtaining customer agreement to a revised delivery date; or issuing another management-approved plan that preserves all material and quality requirements.
The AI must not independently change the commitment, waive quality verification, assume expedited shipping, or promise a revised date.
Recommended planning classification: Escalate — original plan no longer supported by the verified operating conditions.
Related Framework Components
- FTR Governance Doctrine
- FTR Methodology (Core)
- First Tier Review AI Systems Methodology
- AI Systems Capability Domain Taxonomy
- First Tier Review Test Registry

Leave a Reply